Developers & main contractors

One standard process. One verified movement record. Total control across sites and subcontractors.

Standardise how material and waste movements are evidenced — time/GPS, photos and electronic confirmation captured once at source — so valuations, audits and client scrutiny run on one defensible record.

Standardised capture across suppliers Evidence at lift & drop Exportable audit/valuation packs
Video preview
Short overview of the live workflow and the audit/valuation evidence pack.

Why Hub360 on site

Operational control that stands up commercially

Designed for contractor-led rollouts: one consistent movement record across subcontractors and suppliers, suitable for valuation review, client scrutiny and audit.

Coordination

Everyone works from the same live plan — fewer calls, fewer missed drops, fewer re-runs.

  • Instant updates to crews and drivers
  • Less phone-tag; fewer delays
Evidence at source

Time/GPS, photos and electronic confirmation captured at lift and destination.

  • Approvals move faster
  • Disputes reduce materially
Commercial-ready outputs

Clean, structured exports for QS and finance workflows.

  • Valuation support without paper chase
  • Faster invoice reconciliation
Audit defence

A defensible who/when/where/what record for every movement.

  • Vehicle, site and facility context
  • Chain-of-custody where required

Developer standard

Mandate one movement evidence standard across the supply chain

Inconsistent tickets create commercial and audit exposure. A single mandated standard removes ambiguity on quantities, destinations, reuse and costs.

Vendor-neutral contract clause (procurement-safe)

Require capability, not a vendor. Use this clause to make digital, time/GPS-stamped evidence a condition of work and require export packs during valuations.

Digital traceability of material and waste movements

All subcontractors, suppliers and hauliers shall use a real-time digital evidence system to create a record for every movement of materials, products, and construction and demolition (C&D) waste associated with the Works.

Each movement record shall include, at minimum:
• Load type and quantity (or agreed measure)
• Time- and GPS-stamped events at collection (lift) and at destination
• Photographs and/or authorised electronic confirmation where appropriate
• Carrier / vehicle details
• Site and receiving location / facility details (and permit/authorisation references where applicable)
• A complete chain-of-custody where required (producer/holder → carrier → receiving facility)

The Contractor shall provide the Developer/QS with searchable access and one-click export packs (CSV/Excel/PDF) to support valuations, audit, and reporting within 24 hours of request.

The system shall maintain a tamper-evident change log and comply with applicable data protection requirements.
Copied to clipboard ✓

Off-tender note: Hub360 is an example of a system designed to meet the above requirements and is used on live projects. We can tailor the clause to your scope, sites and waste streams.

Risks removed
  • Missing/illegible dockets and weekend admin
  • Ambiguity on quantities, timing and destinations
  • Unaccounted site-won planings / asphalt movements
  • Valuation delays and debit-note ping-pong
  • Compliance guesswork and weak audit trail
Operational gains
  • Geo-stamped evidence at lift and drop
  • Faster QS approvals and valuations
  • Finance-ready exports for reconciliation
  • Defensible chain-of-custody where required
  • CO₂ / Scope-3 roll-ups from verified records
Supply chain benefits
  • Clear job briefs; automatic receipts after drops
  • Fewer call-backs and re-runs
  • Proof-of-work supporting faster payment
  • Professional records that help win work

Operational principle: if it moved, it’s recorded — who/when/where/what, plus evidence and receiving details. One archive. One defensible record.

Workflows we cover

All movements on a job — organised and exportable

Grouped for quick scanning: Into site, Out of site, and Evidence & reporting.

Into site
Materials & product deliveries
  • Aggregates/quarry → sitestone, sand, fill
  • Ready-mix plant → pourwater additions, sign-off
  • Manufacturer deliveries → siteblocks, precast, roof tiles, insulation
Out of site
Waste, reuse & special streams
  • C&D waste → permitted facilityconcrete, timber, metals, plasterboard
  • Planings/asphalt reusereuse or licensed facility
  • Soil/spoil movementssite-won, muck-away
  • Hazardous / special streamswith chain-of-custody
Evidence & reporting
Tickets, datasets & packs
  • Weighbridge ticketsbatch/mix capture
  • Scope 3 / ESG exportsCSV/Excel
Shared plan board
One shared plan
KPI status and exceptions
Live KPIs & exceptions
Soil/spoil movement record on tablet
Soil / spoil ePOD

Next step

Discuss contractor rollout

Typical next step: a short call with your commercial or operations team to review how a standardised movement process could be mandated across projects and suppliers.

Driven by curiosity and built on purpose, this is where bold thinking meets thoughtful execution. Let’s create something meaningful together.

SHOP NOW

HUB 360

Lower your costs while increasing operational efficiencies

HUB 360 eliminates problems you face everyday

background arts -07.jpg

Wasted resources & Lost revenue

  1. Trucks not filled to capacity

  2. Unnecessary journeys using up driver time and fuel

  3. Lack of traceability of goods leading to slippage

  4. Lost paper work & pods resulting in loss of payment by customers