Construction & infrastructure materials

One app. One click. Irrefutable proof for every load.

Time- & GPS-stamped chain-of-custody for products, materials and C&D waste. Contractors capture photos & signatures on site; you export Article 27/28, GPP/circular and Scope 3 packs in minutes — zero extra admin.

One verified source of truth Drivers & crews capture at source Audit-ready in minutes
Hub360 in use: driver capturing GPS/time-stamped ePOD

Trusted by public bodies & industry

Who are you?

Pick your track

Councils & Public Bodies

  • One-click audit packs (Article 27/28, GPP, Scope 3)
  • Irrefutable time/GPS + photo/signature proof
  • Duty-of-care: holder → carrier → facility
  • Zero extra admin — crews capture at source
Explore for councils

Developers & Main Contractors

  • One shared plan across primes & subbies
  • Geo-stamped ePOD → faster valuations, fewer disputes
  • Programme protection: fewer re-runs & phone-tag
  • Verified datasets for Scope 3 / ESG
For developers

Manufacturers & Suppliers

  • Proof at drop (time/GPS + photo/signature ePOD)
  • Mixed-loads & multi-drop with live status
  • Instant job history; haulier portal for accepting jobs
  • Finance-ready CSV/PDF packs for invoices
For manufacturers
One app One click One verified source of truth

Outcomes

Clear benefits, fast

~50% CO₂ ↓

Mannok (reported) after optimising mixed-loads with verifiable ePOD.

Minutes → audit

Article 27/28 & GPP bundles export from live records.

Fewer disputes

Photo/signature ePOD reduces re-runs & phone-tag.

How it works

Plan, capture, export — in one app

Shared live plan
1) Plan & assign

One shared live plan across primes & subbies.

On-the-road ePOD capture
2) Capture at source

Time/GPS + photos + signatures at lift & drop.

Export-ready KPIs and packs
3) Export & share

One-click bundles for Article 27/28, GPP & Scope 3.

Results in the field

Real projects, real proof

Mannok — ~50% CO₂ ↓ (reported)

Mixed-loads optimised; fewer journeys with verifiable ePOD.

Monaghan Co Co — planings → reuse

Geo-stamped evidence supports circular reporting.

Road networks (TII & NRA)

Live proof across lots & crews; shareable audits.

Require it in your tender

Specify a real-time digital evidence app (e.g., Hub360). Contractors create the proof on site; your team simply exports what’s needed — no extra admin.

Contractors must use a digital evidence system (such as Hub360) to create a record for every movement of materials and C&D waste in real time in the field. Each record shall include: time- and GPS-stamped events at lift and at destination; load photos; authorised signatures; carrier, vehicle and facility details; and a complete chain-of-custody (holder → carrier → facility). The Client shall have read access to a searchable project archive and the ability to export audit-ready bundles suitable for Article 27/28 and Green Public Procurement reporting within 24 hours.
See how it ticks the boxes
Copied to clipboard ✓