Construction & infrastructure materials
One app. One click. Irrefutable proof for every load.
Time- & GPS-stamped chain-of-custody for products, materials and C&D waste. Contractors capture photos & signatures on site; you export Article 27/28, GPP/circular and Scope 3 packs in minutes — zero extra admin.
Trusted by public bodies & industry






Who are you?
Pick your track
Councils & Public Bodies
- One-click audit packs (Article 27/28, GPP, Scope 3)
- Irrefutable time/GPS + photo/signature proof
- Duty-of-care: holder → carrier → facility
- Zero extra admin — crews capture at source
Developers & Main Contractors
- One shared plan across primes & subbies
- Geo-stamped ePOD → faster valuations, fewer disputes
- Programme protection: fewer re-runs & phone-tag
- Verified datasets for Scope 3 / ESG
Manufacturers & Suppliers
- Proof at drop (time/GPS + photo/signature ePOD)
- Mixed-loads & multi-drop with live status
- Instant job history; haulier portal for accepting jobs
- Finance-ready CSV/PDF packs for invoices
Outcomes
Clear benefits, fast
Mannok (reported) after optimising mixed-loads with verifiable ePOD.
Article 27/28 & GPP bundles export from live records.
Photo/signature ePOD reduces re-runs & phone-tag.
How it works
Plan, capture, export — in one app

One shared live plan across primes & subbies.

Time/GPS + photos + signatures at lift & drop.
One-click bundles for Article 27/28, GPP & Scope 3.
Results in the field
Real projects, real proof

Mixed-loads optimised; fewer journeys with verifiable ePOD.

Geo-stamped evidence supports circular reporting.

Live proof across lots & crews; shareable audits.
Specify a real-time digital evidence app (e.g., Hub360). Contractors create the proof on site; your team simply exports what’s needed — no extra admin.
Contractors must use a digital evidence system (such as Hub360) to create a record for every movement of materials and C&D waste in real time in the field. Each record shall include: time- and GPS-stamped events at lift and at destination; load photos; authorised signatures; carrier, vehicle and facility details; and a complete chain-of-custody (holder → carrier → facility). The Client shall have read access to a searchable project archive and the ability to export audit-ready bundles suitable for Article 27/28 and Green Public Procurement reporting within 24 hours.