C&D waste → permitted facilities
Prove duty‑of‑care for every load — with zero spreadsheet effort.
Drivers and site teams record time/GPS, photos, signatures and facility/permit details at lift and at the gate. You export Article 27/28 and recovery‑statistics bundles in one click — audit‑ready within 24 hours.

Tick the boxes
Policy & Reporting Map — what you’re accountable for, and how Hub360 delivers
Built for duty‑of‑care, Article 27/28, GPP/circularity, waste recovery statistics, and Scope 3/ESG. Evidence is created in the field, not reconstructed later.
- Chain‑of‑custody for every movement
- Facility permit/ref no., EWC/LoW codes, stream
- Photo/signature proof at lift & gate
- Time/GPS at both ends + load photos
- Vehicle, driver, site & facility metadata
- One‑click export bundle for submissions
- Per‑load, verifiable data (no “dodgy dockets”)
- Avoid under/over‑reporting & statistical drift
- Export datasets for national returns
- Quantities per stream & destination class
- Planings/asphalt & aggregates tracked separately
- Shareable summaries for project teams
- CSV/Excel from verified per‑load entries
- Stream alignment for ESG frameworks
- Feeds internal dashboards & BI
- Searchable per‑project record with timestamps
- One‑click document packs on request
- Clear responsibility trail for every load
Specify a real‑time digital evidence app (e.g. Hub360). Contractors create the proof on site; your team simply exports what’s needed — no extra admin.
Contractors must use a digital evidence system (such as Hub360) to create a record for every movement of construction & demolition waste in real time. Each record shall include: time‑ and GPS‑stamped events at lift and at the receiving facility; load photos; authorised signatures; carrier, vehicle and facility permit details; EWC/LoW codes and waste stream; and a complete chain‑of‑custody (holder → carrier → facility). The Client shall have read access to a searchable project archive and the ability to export audit‑ready bundles suitable for Article 27/28, recovery statistics and Green Public Procurement reporting within 24 hours.
Typical workflows
One‑click, irrefutable evidence for every movement
The same simple app for primes, subbies and permitted collectors — instant records at lift & gate; one‑click exports for councils & clients.
Trusted by public bodies & industry
Used across councils & national authorities





UK & NI — coming down the track
Hub360 UK Compliance Blueprint (DWTS, DoWCoP, U1, WM3)
We’re preparing suppliers, contractors and facilities for the UK’s Digital Waste Tracking Service (DWTS) and related earthworks frameworks. Hub360 (incl. Tipper) captures field evidence and stages DWTS‑ready payloads while supporting DoWCoP, U1 and WM3.
FAQ
Quick answers for C&D waste
How do you prove the receiving facility was permitted?
Each record includes the facility details and permit/reference. Acceptance notes, weighbridge tickets and signatures are attached to the load record.
Can we record EWC/LoW codes and segregated streams?
Yes. Select stream and EWC on the record. Reports break down per stream, per facility and per project for recovery statistics.
What if a load is rejected or contaminated?
Drivers capture photos and reason codes at the gate. The record shows the rejection and where it was subsequently sent, preserving the chain‑of‑custody.
Does it work offline?
Yes. Time/GPS, photos and signatures are captured offline and sync automatically when back in coverage.
How fast can we export audit packs?
In seconds. One‑click bundles include per‑load evidence, tickets, facility/permit details and CSV for Article 27/28 and recovery statistics.
Can this integrate with our waste broker or EAM?
During the trial you get PDF/CSV exports. Post‑trial, we can scope APIs to brokers, EAM or BI dashboards.