TRUSTED BY PUBLIC BODIES & INDUSTRY





Construction & Infrastructure Materials — Live Proof of Movement & Reuse
Live, time- & GPS-stamped chain-of-custody for every movement of construction materials and C&D waste. Contractors capture photos & signatures on site; you export audit-ready bundles with zero extra admin.
C&D waste tracking
Planings / site-won material reuse
Manufacturer deliveries (blocks, roof tiles, precast)
Chain-of-custody (holder → carrier → facility)
Article 27/28 • GPP • Scope 3
Live audit trail
What is Hub360?
An app and portal that create a digital record for every movement — time/GPS, photos, signatures, vehicle, site & facility details.
Why it matters
Councils and main contractors are expected to show duty-of-care and circularity progress. Hub360 makes proof easy and fast.
Who uses it
Crews capture at source; office approves and exports; stakeholders get transparent, searchable evidence on request.
What you get — compliance & assurance
Irrefutable digital proof
Per-load time/GPS with photos & signatures, plus vehicle, site & facility details.
Audit-ready in minutes
One-click bundles by job/date/lot — no paper chase, no weekend admin.
Duty of care, peace of mind
Evidence is captured in real time and every update is change-logged to reduce audit risk.
Plan, capture, export — in one app

One live schedule across main contractors & subcontractors.

Time/GPS + photos + signatures at lift & drop — change-logged.

One-click bundles for Article 27/28, GPP & Scope 3.
What you can expect — without the paper chase
Audit & inspection bundle
Per-load digital proof, bundled by job/date/lot for inspections.
Movement ledger (CSV/Excel)
Structured exports for reconciliation and stakeholder review.
Regulatory summaries
Tonnage & material classes with date/lot filters (LoW/EWC-ready).
CO₂ & trip analysis
Loaded vs empty trips and project totals for environmental reporting.
Performance views
By day, vehicle or supplier to surface exceptions early.
Use cases we cover
Manufacturer deliveries → site
blocks, roof tiles, precast, insulation; mixed-loads & multi-drop
Aggregates/quarry → site
stone, sand, fill
Ready-mix plant → pour
water additions, sign-off (batch/mix capture)
C&D waste → permitted facility
concrete, timber, metals, plasterboard
Planings/asphalt reuse
reuse or licensed facility; holder → carrier → facility evidence
Soil/spoil movements
site-won, muck-away (chain-of-movement)
Hazardous / special streams
with chain-of-custody & facility class
Weighbridge tickets
batch/mix capture; reconciled to movements
Scope-3 / ESG exports
CSV/Excel datasets from verified per-load records
Real projects, real proof
Want results like these?
We’ll tailor a 20-minute walkthrough to your teams and workflows.