UK Operators
DWTS‑ready e‑dockets for carriers & contractors — without changing how you work.
Hub360 (incl. Tipper) gives drivers a simple, offline‑first app to capture GPS/time, LoW/EWC, photos and signatures at lift & drop. Supervisors get validations, reconciliation to weighbridge/invoices, and one‑click exports — ready for facilities and councils, no re‑keying.
Why operators choose Hub360
Proof at source, no admin drag
Paper tickets won’t cut it when DWTS lands. Capture the evidence once in the field — we validate LoW/EWC, permits and signatures on device, and give you clean data for facilities, clients and councils.
How it works
Capture → Validate → Transmit → Reconcile → Report
Driver records origin/destination, LoW/EWC, quantity+unit, photos, signatures; vehicle reg auto‑fills.
On‑device checks for permits/licences, required WM3 fields, U1 counters, DoWCoP flags.
Share PDF/CSV or API payloads with facilities/clients. DWTS staging for receivers that are live.
Match to weighbridge tickets/invoices; exception inbox for missing docs or mismatches.
Duty of Care packs, DoWCoP verification, U1 usage, monthly registers.
Print pre‑numbered dockets; scan‑to‑record with OCR and supervisor approve.
Use‑cases
Built for highways, civils & utilities
Start with ≤10 vehicles and one workflow. We’ll configure e‑dockets, validations and exports, train drivers, and measure success.
Hand over clean data to any UK facility via CSV/Excel, PDF packs or REST API — no re‑keying at the gate.
FAQ
Quick answers for operators
Do we need to change our TMS?
No. Keep your current processes. Hub360 captures evidence in the field and exports data your partners need.
Will drivers need training?
Minimal — most are productive after a 15‑minute walkthrough. We provide a quick‑card and in‑app coach marks.
How do we handle offline areas?
The app is offline‑first. GPS/time, photos and signatures are stored and sync when coverage returns.
Can we share portal access with clients/councils?
Yes — read‑only access by project or site, with search and export controls.
What about hazardous loads?
WM3 validations enforce required fields and flag hazardous indicators. Photos and docs attach to each load.
How quickly can we be DWTS‑ready?
Most pilots hit the success criteria within 4–6 weeks; DWTS staging queues are part of the rollout.