Councils & Public Bodies
One app. One click. Irrefutable, time- & GPS-stamped evidence.
Hub360 is a secure, cloud-based platform used by public bodies to oversee and standardise construction material and C&D waste movements. A single verified digital record across sites and supply chains — supporting duty-of-care, Article 27/28, circular economy, Scope 3 and FOI auditability.
Policy & Reporting Map
What you're accountable for — and how Hub360 delivers it
Built for duty-of-care, Article 27/28, circular economy & GPP, waste recovery statistics accuracy, Scope 3/ESG and procurement/FOI auditability. Evidence is created in the field — not reconstructed in spreadsheets later.
Holder → carrier → facility
Complete chain-of-custody from the moment material leaves the site
- Chain-of-custody for every movement
- Permitted facility & collector details captured
- Photo/signature proof at lift & destination
Audit-ready in minutes
Not days — from a searchable cloud archive, not a filing cabinet
- Time/GPS at both ends + load photos
- Vehicle, driver, site & facility metadata
- One-click export bundle for submissions
Reuse & recovery, not guesswork
GPS-verified reuse quantities — not estimates filled in after the fact
- Planings/asphalt reuse evidence (geo-stamped)
- Quantities per stream & destination class
- Shareable summaries for project teams
Recovery Statistics
Accuracy & integrity by design
Accuracy & integrity by design
Per-load, verifiable data — no "dodgy dockets"
- Per-load, verifiable data at source
- Avoids under/over-reporting & statistical drift
- Export datasets for national returns
Scope 3 / ESG
Numbers you can stand over
Numbers you can stand over
Actual emissions per movement — not calculated from estimates
- CSV/Excel exports from verified records
- Materials & C&D streams aligned to reporting
- Supports internal dashboards & BI tools
Procurement / FOI
Transparent, defensible archive
Transparent, defensible archive
Every record searchable, timestamped and exportable on demand
- Searchable per-project record with timestamps
- One-click document packs on request
- Clear responsibility trail for every load
How it works for your team
Contractors create the evidence. You export what you need.
Hub360 puts the burden of evidence creation on the contractor — at the vehicle, in the field, in real time. Your team gets read-only access to a searchable project archive and can export audit bundles in under 2 minutes, without chasing anyone.
The council team doesn't use the app — contractors do. You log in to a read-only portal, search by project or date, and export whatever you need. That's it.
All subcontractors and hauliers use the same app. Their records feed a single project archive — every load, every carrier, every destination, one searchable record.
Typical workflows
One-click, irrefutable evidence for every movement type
The same simple app for primes, subbies and hauliers — instant records at lift & drop, one-click exports for councils.
| Movement type | What's captured | Export available |
|---|---|---|
| Planings / asphalt reuseReuse or licensed facility | Time/GPS + photos + signature; destination & permit ref | ✓ GPP/circularity & Article 27/28 bundle |
| C&D waste → permitted facilityConcrete, timber, metals, plasterboard | Chain-of-custody; weigh ticket attached; timestamps both ends | ✓ Article 27/28 & recovery statistics |
| Aggregates / quarry → siteStone, sand, fill | Dispatch plan & arrival proof; vehicle/site detail | ✓ Duty-of-care & Scope 3 dataset |
| Ready-mix plant → pourWater additions, sign-off | Batch/mix; photo/signature at pour; GPS/time | ✓ QS valuation & pour record |
| Manufacturer deliveries → siteBlocks, precast, roof tiles, insulation | ePOD at drop (photo/signature); exceptions noted at receipt | ✓ Invoice reconciliation pack |
| Soil / spoil movementsSite-won material, muck-away | Holder → carrier → facility; GPS/time & facility class | ✓ Duty-of-care & Article 27/28 |
| Hazardous / special streamsFull chain-of-custody | Vehicle/permit; GPS/time; authorised signatures | ✓ Hazardous waste compliance bundle |
| Scope 3 / ESG exportsCSV/Excel datasets | Dataset built from verified per-load entries across all streams | ✓ Scope 3 / sustainability report feed |
| Article 27/28 & GPP bundlesAudit-ready on demand | Compiled automatically from the live archive | ✓ One-click PDF/CSV — under 2 minutes |
Require it in your tender
Specify the capability — not a product name. Procurement-safe.
Add this clause to your contract or tender. It specifies what the system must do — real-time capture, GPS, photos, chain-of-custody, 24-hour export — without naming a specific vendor. Procurement-safe and immediately usable.
Trusted by public bodies & industry
Used across councils & national authorities
Hub360 was used on the N2 road project to track road planings — providing GPS-verified reuse evidence, TII circular economy reporting and a complete Article 27/28 chain-of-custody. The project is now a live reference for councils requiring GPP and circular economy evidence on road infrastructure schemes. Read the road planings workflow →
<2 min
Audit pack generated
Article 27/28, DoWCoP or chain-of-custody export ready in under 2 minutes
53 hrs
Admin saved / week
Moyglare Sand & Gravel — 53 hours per week recovered from paper-based processes
~50%
CO₂ reduction
Mannok — approx. 50% cut in delivery-related CO₂ across 5 business units
7 days
To go fully live
50 years of paper to fully digital — every driver live within 7 days
Quick answers for councils
Frequently asked questions
A short call with your commercial or technical team — we walk through the clause, show the portal and run a project-specific scenario. Most councils are ready to specify within one week.
- How do we verify the GPS records are genuine?
- Can we see a live demo on a real project?
- Does it work for hazardous waste streams?
- Is it compatible with our existing EAM / GIS?
- Can we require it as part of an existing framework?
Next step
See it on a live project — 20-minute demo for your team.
We'll walk through the tender clause, the portal view your team would use and the exact export pack an audit, FOI or Article 27/28 request would produce — using a real project scenario.